Back to Projects
Industrial
In Construction

Thanh Hoa Industrial Warehouse

A high-clearance industrial warehouse with steel structure, concrete floor systems, loading docks, and fire safety infrastructure.

Overview

Construction progress and delivery context.

A high-clearance industrial warehouse with steel structure, concrete floor systems, loading docks, and fire safety infrastructure. The project record is structured to support owner reporting, milestone reviews, technical coordination, and handover evidence.

Construction progress68%

Location

Thanh Hoa Industrial Zone

Budget

$7.2M

Duration

14 months

Status

In Construction

Gallery

Site imagery and construction context.

Thanh Hoa Industrial Warehouse gallery 1
Thanh Hoa Industrial Warehouse gallery 2
Thanh Hoa Industrial Warehouse gallery 3

Timeline

Milestone sequence.

1

Earthwork and ground improvement

Planned with field dependencies, authority review, quality checks, and client progress reporting.

2

Steel fabrication and erection

Planned with field dependencies, authority review, quality checks, and client progress reporting.

3

Floor slab and roof envelope

Planned with field dependencies, authority review, quality checks, and client progress reporting.

4

MEP, loading systems, and commissioning

Planned with field dependencies, authority review, quality checks, and client progress reporting.

Technologies

Methods and project systems.

Pre-engineered steel

Industrial slab systems

MEP coordination

Fire safety integration

Budget review

$7.2M

Budget data is seed content for the project showcase and can be connected to a live project management or ERP source.